Cheboygan hydro plant restart during Michigan river flood
Apr 2026Published 18 Nov 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on other incidents in the United States, and an email when EIR-2932 is updated. No account needed; unsubscribe in one click.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
What happened
The 1.5 MW hydro plant at the Cheboygan Lock and Dam in Cheboygan, Michigan, had been dark since a fire at the paper mill next door in September 2023. During spring 2026 flooding of the Cheboygan River, the plant was returned to service. The plant's operator described the restoration, including bearing and head gate work, as a year's worth of work done in seven days, though the restoration had reportedly begun the previous summer.
According to the Michigan Public Service Commission, the turbine returned to service on 17 April 2026. Bridge Michigan reported the water stood 4.92 inches below the top of the dam late on 16 April; the dam is classified as high hazard. Local authorities warned downstream residents to prepare to leave. The operator said that when the turbine briefly tripped offline, the water behind the dam rose about 3 inches in 30 minutes.
According to Michigan State Police, the turbine ran at full capacity until about 8 a.m. on 28 April 2026, when it was shut down so that a turbine bearing could be repaired.
Contributing factors
Flooding of the Cheboygan River with high upstream water levels. The plant had been out of service for about two and a half years before restart. Restoration was carried out under emergency conditions with the dam at risk of overtopping. According to the operator, the turbine's flow went to zero when it tripped, and the reservoir rose. The cause of the trip is not reported. A turbine bearing needed repair after restart.
Lessons learned
- Hydro units that form part of a flood-control structure need a documented plan for what happens to reservoir levels if the unit trips offline.
- Returning a long-idle plant to service during an emergency should be preceded by dewatering, inspection and bearing checks wherever possible, with a clear restart and load-up sequence.
- Operators should define reservoir-level trigger thresholds for evacuation and for turbine shutdown, and make sure these are known to the teams restoring the plant.
More lessons on weather and external hazards, emergency response and public communication, from every incident on the register.
Source
Published 2026-11-18. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.