Storm damages NorNed converter station at Eemshaven, Netherlands
Oct 2013Published 17 Nov 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on grid infrastructure incidents in the Netherlands, and an email when EIR-2925 is updated. No account needed; unsubscribe in one click.
Confirm your email and every substation and transformer incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): TenneT
What happened
A violent storm hit the Netherlands on 28 October and damaged significant components at the converter station in Eemshaven, owned by the Dutch transmission system operator TenneT. The source gives no year for the storm; a press release dated 20 December 2013 places the event in 2013. The NorNed interconnector between Norway and the Netherlands was out of operation as a result. Repair works were complicated and took time. According to the press release, the damage had been repaired and the cable was due to return to service and become available to the electricity market from Friday 20 December.
The interconnector has a capacity of 700 MW and runs between Feda in Norway and Eemshaven, linking the Norwegian price area NO2 to the Dutch electricity market. The cable was commissioned in 2008.
Contributing factors
Storm conditions on 28 October damaged the converter station. The source does not report the wind speed, the specific failed components or the cause of the damage beyond the storm.
Lessons learned
- Converter stations are exposed to severe weather, so storm resilience and the protection of critical components should be assessed for HVDC sites.
- Holding a stock of spare critical components or agreed repair arrangements can shorten the time an interconnector is out of service.
- Interconnector operators should plan for extended outages and communicate expected return-to-service dates to the electricity market.
More lessons on weather and external hazards, from every incident on the register.
Source
Other entries that name Eemshaven
Published 2026-11-17. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.