Transformer explodes during repairs at Eldorado Park substation, Johannesburg

Apr 2022Published 8 Oct 2026Responsible editor: Chief Editor

Estimated damageModelled by the register's adjusterHow? Know the real figure?
Figure hidden: shown to subscribersMedium confidence
supply cut for about •• daysShown in the record →Full estimate

Companies named in this entry: City Power

A substation at Eldorado Park, Johannesburg, was gutted by fire, and several areas lost electricity. City Power was repairing the substation and had promised to restore supply by the evening of Wednesday 20 April 2022. On the Wednesday afternoon, City Power livened up a second transformer at the site, and it exploded at about 15:15. The explosion affected a first transformer, which had been successfully energised the previous day and then tripped on impact.

The utility had switched on the Goldev switching substation at 14:55 and restored customers in Freedom Park, Mpumelelo, Devland and other areas, but the later explosion left areas mostly around Eldorado Park without supply again. City Power said the blown transformer would be replaced with a new unit brought to site, and it gave no estimated time of restoration for the remaining customers. Residents were left without electricity for almost a full week in winter-like temperatures.

The substation had been damaged by a fire the previous week, which also affected other substations serving Devland, Olifantsvlei, Kliptown, Klipspruit and Freedom Park. The executive mayor of the City of Johannesburg described the blaze as a deliberate act of sabotage. The source does not give a technical cause for the transformer explosion.

  1. Test and energise repaired transformers in a controlled sequence, and check for damage from a previous fire before reconnecting them to the network.
  2. Plan restoration for the whole affected network, not only the sections that can be supplied first, and keep customers informed when a restoration time changes.
  3. Protect critical substations against deliberate damage, and review security and monitoring arrangements after a fire at a substation.

More lessons on design, standards and commissioning, outages, backup supply and restoration, theft, arson and site security, from every incident on the register.

Published 2026-10-08. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.

Grid infrastructure incidents in South Africa: 114 entries, with a free alert for the next one.

Browse the full register or submit an incident.