Three transmission towers collapse in Nasarawa storm, cutting regional power supply
Oct 2026Published 8 Oct 2026Updated 9 Oct 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on grid infrastructure incidents in Nigeria, and an email when EIR-2128 is updated. No account needed; unsubscribe in one click.
Confirm your email and every substation and transformer incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Transmission Company of Nigeria
What happened
A severe thunderstorm in Nasarawa State, Nigeria, destroyed three towers on the 132kV Karu-Keffi-Akwanga single circuit transmission line on Wednesday 7 October 2026. The Transmission Company of Nigeria (TCN) said the line tripped on overcurrent relay protection at about 16:06 during rainy and windy conditions. Field investigation found that towers T78, T79 and T80 had buckled under the storm. All 33kV outgoing feeders at the 132/33kV Keffi and 132/33kV Akwanga transmission substations became unavailable, leaving local distribution companies unable to draw power for households and businesses in Keffi and Akwanga.
TCN isolated the damaged corridor, which is now de-energised. Engineers were dispatched to the swampy, storm-damaged terrain to assess the damage. TCN gave no deadline for restoring supply, saying this depended on the technical assessment and the availability of heavy replacement materials.
Contributing factors
TCN attributed the failure to intense rainy and windy conditions. The source reports the terrain as swampy but does not say whether ground conditions contributed to the collapse. No injuries or fatalities were reported.
Lessons learned
- Transmission towers in storm-exposed corridors should be assessed against extreme wind and rainfall loading, including foundation performance on waterlogged or swampy ground.
- Protection trips on lines in severe weather should trigger rapid patrols to locate collapsed structures so restoration can begin without delay.
- Operators should hold spare heavy structural materials and pre-agreed restoration plans so that realistic restoration timelines can be given to customers and distributors.
More lessons on weather and external hazards, structural integrity and turbines, from every incident on the register.
Source
Published 2026-10-08. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.