Estlink 2 interconnector out of service between Finland and Estonia
Dec 2024Published 1 Oct 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on grid infrastructure incidents in Finland, and an email when EIR-1716 is updated. No account needed; unsubscribe in one click.
Confirm your email and every substation and transformer incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Fingrid
What happened
The Estlink 2 interconnector between Finland and Estonia suffered a sudden power outage on 25 December 2024. Finland's transmission system operator Fingrid reported a possible failure of the electricity cable. Authorities are investigating the chain of events, including whether a foreign cargo ship was involved. The link is out of service until the fault is located and repair can start. Fingrid said the failure did not endanger electricity system operation in Finland.
Contributing factors
A possible role for a foreign cargo ship is under investigation. The fault location and cause have not been reported.
Lessons learned
- A reported fault on a cross-border cable needs prompt joint investigation by the operators and the authorities.
- A suspected external cause should not be treated as established until the fault is located.
- System planning should allow supply to continue if one interconnector is lost.
More lessons on electrical protection and isolation, outages, backup supply and restoration, from every incident on the register.
Source
Published 2026-10-01. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.