Fire destroys about 34,000 stored solar panels at Tuan An supply yard, Khanh Hoa
Jan 2018Published 6 Oct 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on solar PV incidents worldwide, and an email when EIR-2107 is updated. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Tuan An Solar Power JSC
What happened
A fire broke out on the morning of Wednesday 10 January 2018 in the 200 square metre supply yard of Tuan An Solar Power JSC in Cam Thinh Tay Commune, Cam Ranh City, Khanh Hoa province, Vietnam. An employee found the fire at around 7.30 am and alerted the local fire department. About 10 fire trucks were sent, and nearly 200 people, including officers and local residents, worked to put it out.
Strong winds and the long distance from water sources kept the fire burning until 1.30 pm. About 34,000 new solar panels were destroyed, with damage estimated at more than VND30 billion (US$1.32 million). The panels had been imported from China in March 2017 for a local 10 MW solar project. They were due to be installed in September 2017, but the project was postponed because of site clearance problems. An initial investigation found that local residents burning rubbish at a nearby site caused the fire.
Contributing factors
An initial investigation identified local residents burning rubbish at a nearby site as the cause. Strong winds and the long distance from water sources kept the fire burning until 1.30 pm. The panels, imported in March 2017, were still in the yard after installation planned for September 2017 was postponed.
Lessons learned
- Solar modules stored before installation are a large fire load and should be kept clear of vegetation and of places where open burning happens.
- Equipment storage yards should have a water supply or firefighting provision sized for the stock held, especially where water sources are distant or winds are strong.
- When installation is delayed, developers should review how long equipment will remain in storage and the fire controls around that storage.
More lessons on maintenance, inspection and ageing assets, fire suppression and firefighting, from every incident on the register.
Source
Site page: Tuan An solar project (status, dates and other incidents)
Published 2026-10-06. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.