Drilling incident at Horseshoe Solar affects local water supplies
Feb 2026Published 15 Sept 2026Responsible editor: Chief Editor
- Where
- Horseshoe Solar project near Caledonia, New York
- What
- Groundwater surfaced from two bore holes during horizontal directional drilling
- Response
- Work stopped; New York State regulators notified; holes grouted on 8 March
- Cause
- Not reported
- Outcome
- Low water levels in five homes; temporary supplies provided
Get the next one by email
Free alerts on solar PV incidents in the United States, and an email when EIR-0734 is updated. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Horseshoe Solar
What happened
On 3 February 2026, during horizontal directional drilling to install a conduit beneath the Genesee River for the Horseshoe Solar project near Caledonia, New York, groundwater surfaced from two bore holes and briefly spread onto a nearby agricultural field. Work stopped and the New York State Department of Public Service and the Department of Environmental Conservation were notified. After approval, hydrophobic foam grout was applied and finished on 8 March.
The company said no water later surfaced from the grouted holes. In the following weeks, four homes in Meadowood and one on East River Road had low water levels. Horseshoe Solar supplied drinking water and temporary potable systems. Some residents also reported cloudy tap water. Neither the company nor the Department of Public Service gave a cause for that cloudiness.
Contributing factors
The company said pressurised groundwater came to the surface during horizontal directional drilling, which it described as a known possibility of this construction method. The Department of Public Service called encountering pressurised water during such drilling unusual. A cause for later cloudy or low household water has not been reported.
Lessons learned
- Horizontal directional drilling beside rivers can release pressurised groundwater, so operators must plan for surface flows and have sealing methods ready.
- Regulator approval must be obtained before sealing bore holes after a release during drilling.
- Nearby homes should receive temporary drinking water promptly if low or cloudy supplies are reported after drilling.
More lessons on emergency response and public communication, from every incident on the register.
Not yet known
- Cause of low or cloudy household water
- Link between drilling and water supply changes
This entry is updated when these are reported. Get an alert for the next one like it.
Source
Published 2026-09-15. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.