A significant fire occurred at an Entergy substation in Port Neches. The fire was reported at approximately 6 p.m. and was contained within about two hours. Firefighters applied water and foam to cool transformers and electrical equipment. No injuries were reported. Power outages affected nearby neighbourhoods. The scene remained active with cooling operations after the fire was extinguished. The cause is under investigation and may relate to electrical equipment.
Contributing factors
The cause may be related to electrical equipment at the substation.
Lessons learned
Early containment of substation fires can prevent spread to adjacent properties.
Substation incidents can cause localised power outages.
Cooling of electrical equipment after fire suppression supports safe resolution.
Subscribers see the structured record behind an entry where one exists: site, operator, manufacturer and integrator, capacity, incident date, root cause, downtime, loss estimate, and every source.
Preparing or reviewing a planning application for a site like this? The planning evidence pack sets out every comparable incident for one project, with sources. £295, by email in minutes.