Reported power outage at Equinix Ashburn data centre linked to AWS connectivity problems
Mar 2018Published 4 Oct 2026Updated 13 Oct 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on data centre incidents in the United States, and an email when EIR-1990 is updated. No account needed; unsubscribe in one click.
Confirm your email and every data centre incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Amazon Web Services, Equinix
What happened
On Friday 2 March 2018, a nor'easter storm knocked out utility power in the Washington region, including Loudoun County, Virginia. Equinix said that the weather affected power at a property it leases in Ashburn, Virginia, and that it activated its contingency plans, but these did not prevent a service interruption for some customers. Amazon Web Services reported that its Direct Connect service had lost connectivity to Equinix data centres DC1 to DC6 and DC10 to DC12 on the Ashburn campus, and to CoreSite facilities VA1 and VA2 in nearby Reston.
Direct Connect issues began around 6:20 am Eastern and lasted close to four hours for some customers. CoreSite said its facilities did not go down in terms of uptime, and did not explain why Direct Connect links to them had dropped. Equinix said the affected facility was operating on normal utility power again. The source did not establish whether the outage affected the whole Ashburn campus or a single facility housing shared Direct Connect infrastructure. The Equinix attribution rests on one source.
Contributing factors
Regional utility power loss caused by a nor'easter storm. The source does not confirm the full cause of the failure of the contingency arrangements, or whether backup power was unavailable or failed to start. A single facility may have housed critical infrastructure serving all Direct Connect links on the campus, but this was not confirmed.
Lessons learned
- Confirm that backup power and transfer systems at colocation sites carry the full critical load, and test them under real utility loss conditions.
- Map which shared network or interconnection equipment sits in which building, so a single-building power loss does not silently take down links for many customers.
- Customers relying on a single private cloud link should set up redundant links with fast failure detection, as the cloud provider itself recommended.
More lessons on outages, backup supply and restoration, detection and monitoring, from every incident on the register.
Source
Site page: Equinix (status, dates and other incidents)
Other entries that name Equinix
Published 2026-10-04. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.