Vestas blade fails at Timber Road IV wind farm in Ohio
Sept 2020Published 15 Sept 2026Responsible editor: Chief Editor
- Where
- Timber Road IV wind farm in Ohio
- Operator
- EDP Renewables
- Manufacturer
- Vestas
- What
- Blade on V150 4.2MW turbine suffered heavy damage
- Injuries
- None reported
Get the next one by email
Free alerts on wind (onshore) incidents in the United States, and an email when EIR-0805 is updated. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): EDP Renewables, Vestas
What happened
A blade on a Vestas V150 4.2MW turbine at the Timber Road IV wind farm in Ohio suffered heavy damage in a failure on 3 September 2020. No one was injured. Vestas and EDP Renewables secured the site and conducted a site wide inspection of blades on the other 30 turbines at the wind farm, finding no additional damage or indication of other failures. The companies stated they could not speculate on the cause and were conducting a root cause analysis.
The damaged blade will be replaced at a date to be determined, after which the turbine will return to full service. EDP Renewables said it was working with the Ohio Power Siting Board and local law enforcement on public safety response efforts.
Contributing factors
Not reported; a root cause investigation was underway at the time of reporting.
Lessons learned
- After a blade failure on a Vestas V150 turbine, operators should inspect blades on all turbines at the site to rule out a shared fault.
- Following a blade failure that may affect public safety, the operator must work with local regulators and law enforcement on response.
More lessons on structural integrity and turbines, from every incident on the register.
Not yet known
- Root cause of the blade failure
- Age and service history of the turbine
- Duration of turbine downtime
- Cost of blade replacement
This entry is updated when these are reported. Get an alert for the next one like it.
Source
Site page: Timber Road IV (status, dates and other incidents)
Published 2026-09-15. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.