← Back to Ohio

Onshore wind · United States

LafargeHolcim - Paulding Wind Project

Operator Paulding Wind 28, LLC

Operational4.5 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

LafargeHolcim - Paulding Wind Project is a 4.5 MW wind farm 24 km south-west of Defiance, Paulding County, Ohio, United States. It first operated in 2020. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 107 incidents at wind farms in the United States, and 362 worldwide.

24 energy sites within 40 km for LafargeHolcim - Paulding Wind Project

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
4.5 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
Paulding Wind 28, LLC
Owner
Paulding Wind 28, LLC
Location
Paulding County, Ohio, United States
First operating
2020
Balancing authority
PJM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names LafargeHolcim - Paulding Wind Project. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has LafargeHolcim - Paulding Wind Project had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names LafargeHolcim - Paulding Wind Project; it holds 107 incidents at wind farms in the United States.
What is the status of LafargeHolcim - Paulding Wind Project?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is LafargeHolcim - Paulding Wind Project?
24 km south-west of Defiance, Paulding County, Ohio, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).