Transformer fire at Tangedco substation near Kayathar contained after ten hours

June 2025Published 7 Sept 2026Responsible editor: Chief Editor

Estimated damageEstimated by the register's adjusterHow? Know the real figure?
Figure hidden: shown to subscribersMedium confidence
supply cut for about •• daysShown in the record →Full estimate
From the recordRoot cause hiddenFailed part hidden
Where
Tangedco substation at Panikkarkulam village near Kayathar, Thoothukudi district, Tamil Nadu
Operator
Tangedco
What
Fire broke out at a power transformer around 4 a.m.
Cause
Technical fault ignited transformer oil
Response
Seven fire tenders and two private vehicles; fire doused after ten hours

Companies named in the reporting of this entry (being named is not a finding of fault): Tangedco

A fire broke out around 4 a.m. at a power transformer in a Tangedco substation at Panikkarkulam village near Kayathar, Thoothukudi district, Tamil Nadu. A technical fault in one of four transformer units ignited the transformer oil, of which each unit holds around 70,000 litres, causing the fire to spread rapidly and produce thick black smoke. Power supply was cut to prevent the fire spreading to the other three units.

Seven fire tenders from several nearby towns and two private firefighting vehicles were deployed, using water jets and foam extinguishers to cool the transformer, before sand was applied using JCB machines to fully extinguish the blaze. The fire was brought under control after about ten hours and fully doused by 4 p.m. Only the one unit was affected, with no disruption to public life reported.

Large volume of transformer oil (approximately 70,000 litres) fuelled the rapid spread of the fire, and the substation's nitrogen suspension fire suppression system failed to function as intended.

  1. Oil-filled transformers holding around 70,000 litres each need working nitrogen injection systems, as this unit's suppression system failed to operate.
  2. Operators at multi-unit substations should isolate power to a faulted transformer at once, as this cut prevented spread to the other three units.
  3. Substations with large oil volumes require pre-planned multi-agency response, given the ten-hour effort with seven tenders and foam.

More lessons on fire suppression and firefighting, spacing, layout and fire spread, from every incident on the register.

  • Exact technical fault that ignited the oil
  • Age and model of the affected transformer
  • Cost of damage and repair time

This entry is updated when these are reported. Get an alert for the next one like it.

Other entries that name Tangedco

Published 2026-09-07. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.

See the register's stories first in Google: add it as a preferred source.

Chart to reuse with this story: Grid infrastructure incidents in India, by year, free with a credit (PNG).

Grid infrastructure incidents in India: 88 entries, with a free alert for the next one.

Substation and transformer fires: the counts, the latest entries and a free alert for the next one.

Browse the full register or submit an incident.