Transformer fire at Tangedco substation near Kayathar contained after ten hours
June 2025Published 7 Sept 2026Responsible editor: Chief Editor
- Where
- Tangedco substation at Panikkarkulam village near Kayathar, Thoothukudi district, Tamil Nadu
- Operator
- Tangedco
- What
- Fire broke out at a power transformer around 4 a.m.
- Cause
- Technical fault ignited transformer oil
- Response
- Seven fire tenders and two private vehicles; fire doused after ten hours
Get the next one by email
Free alerts on grid infrastructure incidents in India, and an email when EIR-0482 is updated. No account needed; unsubscribe in one click.
Confirm your email and every substation and transformer incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Tangedco
What happened
A fire broke out around 4 a.m. at a power transformer in a Tangedco substation at Panikkarkulam village near Kayathar, Thoothukudi district, Tamil Nadu. A technical fault in one of four transformer units ignited the transformer oil, of which each unit holds around 70,000 litres, causing the fire to spread rapidly and produce thick black smoke. Power supply was cut to prevent the fire spreading to the other three units.
Seven fire tenders from several nearby towns and two private firefighting vehicles were deployed, using water jets and foam extinguishers to cool the transformer, before sand was applied using JCB machines to fully extinguish the blaze. The fire was brought under control after about ten hours and fully doused by 4 p.m. Only the one unit was affected, with no disruption to public life reported.
Contributing factors
Large volume of transformer oil (approximately 70,000 litres) fuelled the rapid spread of the fire, and the substation's nitrogen suspension fire suppression system failed to function as intended.
Lessons learned
- Oil-filled transformers holding around 70,000 litres each need working nitrogen injection systems, as this unit's suppression system failed to operate.
- Operators at multi-unit substations should isolate power to a faulted transformer at once, as this cut prevented spread to the other three units.
- Substations with large oil volumes require pre-planned multi-agency response, given the ten-hour effort with seven tenders and foam.
More lessons on fire suppression and firefighting, spacing, layout and fire spread, from every incident on the register.
Not yet known
- Exact technical fault that ignited the oil
- Age and model of the affected transformer
- Cost of damage and repair time
This entry is updated when these are reported. Get an alert for the next one like it.