← Back to Co. Tyrone

Onshore wind · United Kingdom

Thornog Windfarm Extension

Operator Energia Renewables

Operational9.2 MWData checked 16 November 2026Source record dated 23 May 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Thornog Windfarm Extension is a 9.2 MW wind farm 12 km north-west of Dromore, Co. Tyrone, United Kingdom. Its planning application (K/2009/0243/F) went to Fermanagh and Omagh on 1 April 2009 and was granted on 11 September 2012. It has been operating since 22 December 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 18 other energy sites within 10 km, 17 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 8 other sites and 167 energy sites within 40 km for Thornog Windfarm Extension

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
9.2 MW (this record)
All phases
18.4 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Energia Renewables
Location
Thornog, Meenadoan townland, Drumquin. Co Tyrone, Co. Tyrone, United Kingdom
Planning authority
Fermanagh and Omagh
Planning application
K/2009/0243/F
First operating
2014
Turbines
4

This record is 9.2 MW, one part of a site built in phases. With Thornog Windfarm (9.2 MW) the phases on the register add up to 18.4 MW. Thornog Windfarm

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for K/2009/0243/F, with what the planning evidence pack adds for this site.

Every application in Fermanagh and Omagh · Alerts for applications and incidents near here

  • 1 April 2009 Planning application submitted
  • 11 September 2012 Planning permission granted
  • 13 June 2014 Construction started
  • 22 December 2014 Operational

None found. The register holds no published incident that names Thornog Windfarm Extension. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Thornog Windfarm Extension had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Thornog Windfarm Extension; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Thornog Windfarm Extension?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 23 May 2016.
Where is Thornog Windfarm Extension?
12 km north-west of Dromore, Co. Tyrone, United Kingdom.