Onshore wind · United Kingdom
Thornog Windfarm Extension
Operator Energia Renewables
Operational9.2 MWData checked 16 November 2026Source record dated 23 May 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Thornog Windfarm Extension is a 9.2 MW wind farm 12 km north-west of Dromore, Co. Tyrone, United Kingdom. Its planning application (K/2009/0243/F) went to Fermanagh and Omagh on 1 April 2009 and was granted on 11 September 2012. It has been operating since 22 December 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 18 other energy sites within 10 km, 17 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Thornog Windfarm Extension changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 9.2 MW (this record)
- All phases
- 18.4 MW, the phases on the register added up
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Energia Renewables
- Location
- Thornog, Meenadoan townland, Drumquin. Co Tyrone, Co. Tyrone, United Kingdom
- Planning authority
- Fermanagh and Omagh
- Planning application
- K/2009/0243/F
- First operating
- 2014
- Turbines
- 4
This record is 9.2 MW, one part of a site built in phases. With Thornog Windfarm (9.2 MW) the phases on the register add up to 18.4 MW. Thornog Windfarm
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for K/2009/0243/F, with what the planning evidence pack adds for this site.
Every application in Fermanagh and Omagh · Alerts for applications and incidents near here
Timeline
- 1 April 2009 Planning application submitted
- 11 September 2012 Planning permission granted
- 13 June 2014 Construction started
- 22 December 2014 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Thornog Windfarm Extension. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Thornog Windfarm Extension had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Thornog Windfarm Extension; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Thornog Windfarm Extension?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 23 May 2016.
- Where is Thornog Windfarm Extension?
- 12 km north-west of Dromore, Co. Tyrone, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).