Onshore wind · United Kingdom
Curraghamulkin (Dooish Wind Farm)
Operator DW Consultancy
Operational30 MWData checked 16 November 2026Source record dated 30 October 2018
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Curraghamulkin (Dooish Wind Farm) is a 30 MW wind farm 8 km north-west of Dromore, Co. Tyrone, United Kingdom. Its planning application (K/2008/0334/F) went to Fermanagh and Omagh on 12 March 2008 and was granted on appeal on 10 November 2017. It has been operating since 15 July 2018. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 20 other energy sites within 10 km, 16 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Curraghamulkin (Dooish Wind Farm) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 30 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- DW Consultancy
- Location
- Coolavannagh TD, Curraghmulkin TD, Dooish TD, Drumquin, Co. Tyrone, United Kingdom
- Planning authority
- Fermanagh and Omagh
- Planning application
- K/2008/0334/F
- Appeal reference
- 2015/A0200
- First operating
- 2018
- Turbines
- 10, 130 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for K/2008/0334/F, with what the planning evidence pack adds for this site.
Every application in Fermanagh and Omagh · Alerts for applications and incidents near here
Timeline
- 12 March 2008 Planning application submitted
- 22 January 2016 Appeal lodged
- 25 January 2016 Planning permission refused
- 10 November 2017 Planning permission granted
- 10 November 2017 Appeal granted
- 15 January 2018 Construction started
- 15 July 2018 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Curraghamulkin (Dooish Wind Farm). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Curraghamulkin (Dooish Wind Farm) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Curraghamulkin (Dooish Wind Farm); it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Curraghamulkin (Dooish Wind Farm)?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 30 October 2018.
- Where is Curraghamulkin (Dooish Wind Farm)?
- 8 km north-west of Dromore, Co. Tyrone, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).