Onshore wind · United Kingdom
Slieveglass
Operator Slieveglass wind farm (Energia)
Operational6.9 MWData checked 16 November 2026Source record dated 27 November 2018
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Slieveglass is a 6.9 MW wind farm 15 km north-west of Dromore, Co. Tyrone, United Kingdom. Its planning application (J/2008/0088) went to Fermanagh and Omagh on 28 January 2008 and was granted on appeal on 12 June 2013. It has been operating since 10 August 2018. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 24 other energy sites within 10 km, 23 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Slieveglass changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 6.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Slieveglass wind farm (Energia)
- Location
- Bullock Park, Drumquin, Co. Tyrone, Co. Tyrone, United Kingdom
- Planning authority
- Fermanagh and Omagh
- Planning application
- J/2008/0088
- Appeal reference
- 2012/A0053
- First operating
- 2018
- Turbines
- 3
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for J/2008/0088, with what the planning evidence pack adds for this site.
Every application in Fermanagh and Omagh · Alerts for applications and incidents near here
Timeline
- 28 January 2008 Planning application submitted
- 30 April 2012 Planning permission refused
- 12 June 2013 Planning permission granted
- 12 June 2013 Appeal granted
- 1 September 2017 Construction started
- 10 August 2018 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Slieveglass. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Slieveglass had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Slieveglass; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Slieveglass?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 27 November 2018.
- Where is Slieveglass?
- 15 km north-west of Dromore, Co. Tyrone, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).