Onshore wind · United Kingdom

Castlecraig

Operator Renewable Energy Systems (RES)

Operational25 MWData checked 16 November 2026Source record dated 18 April 2019

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Castlecraig is a 25 MW wind farm 15 km north-west of Dromore, Co. Tyrone, United Kingdom. Its planning application (K/2006/1934/F) went to Fermanagh and Omagh on 15 December 2006 and was granted on 1 June 2011. It has been operating since 15 August 2018. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 22 other energy sites within 10 km, 21 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 80 other sites and 165 energy sites within 40 km for Castlecraig

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
25 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Renewable Energy Systems (RES)
Location
Castlecraig (Slieve Glass) in Castlecraig, Sloughan, Killoan and Curraghmacall townlands. The proposed site is approximately 5 km south of Killen and 5 km west of Drumquin beside Lough Hill., Co. Tyrone, United Kingdom
Planning authority
Fermanagh and Omagh
Planning application
K/2006/1934/F
First operating
2018
Turbines
10

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for K/2006/1934/F, with what the planning evidence pack adds for this site.

Every application in Fermanagh and Omagh · Alerts for applications and incidents near here

  • 15 December 2006 Planning application submitted
  • 1 June 2011 Planning permission granted
  • 20 April 2017 Construction started
  • 15 August 2018 Operational

None found. The register holds no published incident that names Castlecraig. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Castlecraig had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Castlecraig; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Castlecraig?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 18 April 2019.
Where is Castlecraig?
15 km north-west of Dromore, Co. Tyrone, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).