← Back to Somerset
Planning pack for this site, £295Other options

Solar · United Kingdom

Tengore Lane Solar Development

Operator TGC Renewables

Revised5.8 MWData checked 16 November 2026Source record dated 14 September 2012

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Tengore Lane Solar Development is a 5.8 MW solar farm 9.7 km south of Street, Somerset, United Kingdom. Its planning application (12/01902/FUL) went to Somerset on 21 May 2012 and was refused on 20 August 2012. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 21 other energy sites within 10 km, 19 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

TGC RENEWABLES LTD (07499954), dissolved, since 2011. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Tengore Lane Solar Development sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1526, Solar panels catch fire on a retail or public building roof in South Petherton, 11 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15262025Solar panels catch fire on a retail or public building roof in South Petherton11 kmMinor
EIR-15242025Fire at a solar PV equipped house in Stoney Stratton24 kmSignificant
EIR-14532026Fire crews tackle solar panel unit blaze in Burnham-On-Sea25 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
5.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
TGC Renewables
Location
N/O Tengore Lane, Long Sutton, Langport, Somerset, TA10 9JL, United Kingdom
Planning authority
Somerset
Planning application
12/01902/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 12/01902/FUL, with what the planning evidence pack adds for this site.

Every application in Somerset · Alerts for applications and incidents near here

  • 21 May 2012 Planning application submitted
  • 20 August 2012 Planning permission refused

None found. The register holds no published incident that names Tengore Lane Solar Development. If you know of one, report it (confidential reports are anonymised).

Has Tengore Lane Solar Development had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Tengore Lane Solar Development; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Tengore Lane Solar Development?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 14 September 2012.
Where is Tengore Lane Solar Development?
9.7 km south of Street, Somerset, United Kingdom (postcode TA10 9JL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).