Strath of Brydock - Extension is a 2.3 MW wind farm 12 km north-west of Turriff, Grampian, United Kingdom. Its planning application (APP/2008/2404) went to Aberdeenshire on 15 November 2008 and was refused on 19 July 2016. It has been operating since 1 December 2009. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 25 other energy sites within 10 km, 20 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 34 other sites and 201 energy sites within 40 km for Strath of Brydock - Extension

Members see the sites and incidents around this one, and every record behind them.

GREEN CAT RENEWABLES LIMITED (SC277156), active, since 2004. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
2.3 MW (this record)
All phases
6.9 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Green Cat Renewables
Owner
Green Cat Holdco Limited
Location
Strath of Brydock, Alvah, Banff, Grampian, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2008/2404
First operating
2009
Turbines
1

This record is 2.3 MW, one part of a site built in phases. With Strath of Brydock (4.6 MW) the phases on the register add up to 6.9 MW. Strath of Brydock

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/2008/2404, with what the planning evidence pack adds for this site.

Every application in Aberdeenshire · Alerts for applications and incidents near here

  • 15 November 2008 Planning application submitted
  • 16 October 2009 Planning permission granted
  • 1 December 2009 Operational
  • 19 July 2016 Planning permission refused

None found. The register holds no published incident that names Strath of Brydock - Extension. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Strath of Brydock - Extension had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Strath of Brydock - Extension; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Strath of Brydock - Extension?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 9 June 2010.
Where is Strath of Brydock - Extension?
12 km north-west of Turriff, Grampian, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).