Onshore wind · United Kingdom

Gawnsmoss Cluster

Operator Farm Energy Consulting

Operational2.4 MWData checked 16 November 2026Source record dated 27 March 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Gawnsmoss Cluster is a 2.4 MW wind farm 13 km north-west of Turriff, Aberdeenshire, United Kingdom. Its planning application (APP/2012/2406) went to Aberdeenshire on 10 October 2012 and was granted on appeal on 11 March 2015. It has been operating since 27 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 21 other energy sites within 10 km, 16 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

200 energy sites within 40 km for Gawnsmoss Cluster

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
2.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Farm Energy Consulting
Location
Site at Cairnhill Banff, Aberdeenshire, AB45 3BS, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2012/2406
Appeal reference
PPA-110-2248
First operating
2017
Turbines
3, 79 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/2012/2406, with what the planning evidence pack adds for this site.

Every application in Aberdeenshire · Alerts for applications and incidents near here

  • 10 October 2012 Planning application submitted
  • 2 October 2014 Planning permission refused
  • 2 December 2014 Appeal lodged
  • 11 March 2015 Planning permission granted
  • 11 March 2015 Appeal granted
  • 15 October 2016 Construction started
  • 27 March 2017 Operational

None found. The register holds no published incident that names Gawnsmoss Cluster. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Gawnsmoss Cluster had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Gawnsmoss Cluster; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Gawnsmoss Cluster?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 27 March 2017.
Where is Gawnsmoss Cluster?
13 km north-west of Turriff, Aberdeenshire, United Kingdom (postcode AB45 3BS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).