Onshore wind · United Kingdom
Gawnsmoss Cluster
Operator Farm Energy Consulting
Operational2.4 MWData checked 16 November 2026Source record dated 27 March 2017
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Gawnsmoss Cluster is a 2.4 MW wind farm 13 km north-west of Turriff, Aberdeenshire, United Kingdom. Its planning application (APP/2012/2406) went to Aberdeenshire on 10 October 2012 and was granted on appeal on 11 March 2015. It has been operating since 27 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 21 other energy sites within 10 km, 16 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Gawnsmoss Cluster changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 2.4 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Farm Energy Consulting
- Location
- Site at Cairnhill Banff, Aberdeenshire, AB45 3BS, United Kingdom
- Planning authority
- Aberdeenshire
- Planning application
- APP/2012/2406
- Appeal reference
- PPA-110-2248
- First operating
- 2017
- Turbines
- 3, 79 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for APP/2012/2406, with what the planning evidence pack adds for this site.
Every application in Aberdeenshire · Alerts for applications and incidents near here
Timeline
- 10 October 2012 Planning application submitted
- 2 October 2014 Planning permission refused
- 2 December 2014 Appeal lodged
- 11 March 2015 Planning permission granted
- 11 March 2015 Appeal granted
- 15 October 2016 Construction started
- 27 March 2017 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Gawnsmoss Cluster. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Gawnsmoss Cluster had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Gawnsmoss Cluster; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Gawnsmoss Cluster?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 27 March 2017.
- Where is Gawnsmoss Cluster?
- 13 km north-west of Turriff, Aberdeenshire, United Kingdom (postcode AB45 3BS).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).