← Back to Grampian
Planning pack for this site, £295Other options

Solar · United Kingdom

Denhead - Solar Array

Operator Muirden Energy

Awaiting Construction25 MWData checked 16 November 2026Source record dated 9 April 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Denhead - Solar Array is a 25 MW solar farm 14 km north-west of Turriff, Grampian, United Kingdom. Its planning application (APP/2023/2040) went to Aberdeenshire on 21 November 2023 and was granted on 18 April 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 22 other energy sites within 10 km, one of them a solar farm. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

MUIRDEN ENERGY LLP (SO302777), active, since 2010. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Denhead - Solar Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1476, House fire reported to have started on solar panels in Carnoustie, 127 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14762026House fire reported to have started on solar panels in Carnoustie127 kmSignificant
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline183 kmMinor
EIR-20162022Solar panel fire evacuates Hawick High School247 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
25 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Muirden Energy
Location
Denhead, Banff, Grampian, AB45 3AL, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2023/2040

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/2023/2040, with what the planning evidence pack adds for this site.

Every application in Aberdeenshire · Alerts for applications and incidents near here

  • 21 November 2023 Planning application submitted
  • 18 April 2024 Planning permission granted
  • 18 April 2027 Planning permission runs out

None found. The register holds no published incident that names Denhead - Solar Array. If you know of one, report it (confidential reports are anonymised).

Has Denhead - Solar Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Denhead - Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Denhead - Solar Array?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 9 April 2026.
Where is Denhead - Solar Array?
14 km north-west of Turriff, Grampian, United Kingdom (postcode AB45 3AL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).