Onshore wind · United Kingdom
Drum Hollistan Wind Farm
Operator Muirden Energy
Application Refused35 MWData checked 16 November 2026Source record dated 25 June 2020
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Drum Hollistan Wind Farm is a 35 MW wind farm 19 km west of Thurso, Highland, United Kingdom. Its planning application (20/00645/FUL) went to Highland on 17 February 2020 and was refused on 23 September 2020. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 18 other energy sites within 10 km, 10 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Drum Hollistan Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
MUIRDEN ENERGY LLP (SO302777), active, since 2010. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Onshore wind
- Capacity
- 35 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Muirden Energy
- Location
- the Sandside Estate, Land 2215M SW Of Under Keepers, Sandside, Reay, Thurso, Highland, KW14 7RN, United Kingdom
- Planning authority
- Highland
- Planning application
- 20/00645/FUL
- Turbines
- 7, 125 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 20/00645/FUL, with what the planning evidence pack adds for this site.
Every application in Highland · Alerts for applications and incidents near here
Timeline
- 17 February 2020 Planning application submitted
- 23 September 2020 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Drum Hollistan Wind Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Drum Hollistan Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Drum Hollistan Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Drum Hollistan Wind Farm?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 25 June 2020.
- Where is Drum Hollistan Wind Farm?
- 19 km west of Thurso, Highland, United Kingdom (postcode KW14 7RN).