Onshore wind · United Kingdom
Hill of Glaschyle Wind Farm
Operator Muirden Energy
Operational27.6 MWData checked 16 November 2026Source record dated 4 April 2017
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Hill of Glaschyle Wind Farm is a 27.6 MW wind farm 11 km south of Forres, Grampian, United Kingdom. Its planning application (13/00053/EIA) went to Moray on 14 January 2013 and was granted on appeal on 31 March 2014. It has been operating since 1 December 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 9 other energy sites within 10 km, 4 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Hill of Glaschyle Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
What this site did, from settlement data
Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.
30 settled days to 4 Nov: 2,334 MWh, running 80% of half hours, peak 14 MW of 28, load factor 12%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.
A day out costs this site about £9,947 at its earnings over the last 30 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.
Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.
The company behind this site
MUIRDEN ENERGY LLP (SO302777), active, since 2010. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Onshore wind
- Capacity
- 27.6 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Muirden Energy
- Location
- Hill Of Glaschyle Logie Forres Moray, Grampian, United Kingdom
- Planning authority
- Moray
- Planning application
- 13/00053/EIA
- Appeal reference
- 14/00001/REF
- First operating
- 2016
- Turbines
- 12, 99 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 13/00053/EIA, with what the planning evidence pack adds for this site.
Every application in Moray · Alerts for applications and incidents near here
Timeline
- 14 January 2013 Planning application submitted
- 18 December 2013 Planning permission refused
- 31 March 2014 Planning permission granted
- 31 March 2014 Appeal granted
- 1 June 2016 Construction started
- 1 December 2016 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Hill of Glaschyle Wind Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Hill of Glaschyle Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Hill of Glaschyle Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Hill of Glaschyle Wind Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 April 2017.
- Where is Hill of Glaschyle Wind Farm?
- 11 km south of Forres, Grampian, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).