← Back to Highland
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Dounreay, Thurso - Battery Energy Storage

Operator Ylem Energy Limited (Reay Power)

Under Construction34 MWData checked 16 November 2026Source record dated 18 June 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Dounreay, Thurso - Battery Energy Storage is a 34 MW battery storage site 13 km west of Thurso, Highland, United Kingdom. Its planning application (24/01669/FUL) went to Highland on 20 May 2024 and was granted on 31 January 2025. Construction started on 1 May 2025. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 27 other energy sites within 10 km, 6 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Dounreay, Thurso - Battery Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 578 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool578 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells628 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire771 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
34 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Ylem Energy Limited (Reay Power)
Location
590m Ne/O Isauld Cottage, Reay, Thurso, Highland, KW14 7RW, United Kingdom
Planning authority
Highland
Planning application
24/01669/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/01669/FUL, with what the planning evidence pack adds for this site.

Every application in Highland · Alerts for applications and incidents near here

  • 20 May 2024 Planning application submitted
  • 31 January 2025 Planning permission granted
  • 1 May 2025 Construction started

None found. The register holds no published incident that names Dounreay, Thurso - Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).

Has Dounreay, Thurso - Battery Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Dounreay, Thurso - Battery Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Dounreay, Thurso - Battery Energy Storage?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 18 June 2025.
Where is Dounreay, Thurso - Battery Energy Storage?
13 km west of Thurso, Highland, United Kingdom (postcode KW14 7RW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).