Planning application · Onshore wind · Aberdeenshire

Gawnsmoss Cluster

Operational2.4 MWApplication APP/2012/2406Submitted 10 October 2012Granted on appeal 11 March 2015

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
APP/2012/2406
Planning authority
Aberdeenshire
Nation
Scotland
Technology
Onshore wind
Capacity
2.4 MW
Status
Operational
Operator or applicant
Farm Energy Consulting
Location
Site at Cairnhill Banff, AB45 3BS
Appeal reference
PPA-110-2248
Turbines
3, 79 m to tip
First operating
2017
  • 10 October 2012 Planning application submitted
  • 2 October 2014 Planning permission refused
  • 2 December 2014 Appeal lodged
  • 11 March 2015 Planning permission granted
  • 11 March 2015 Appeal granted
  • 15 October 2016 Construction started
  • 27 March 2017 Operational

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1386, Wind turbine fire near St Cyrus in Aberdeenshire, 95 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-13862022Wind turbine fire near St Cyrus in Aberdeenshire95 kmMinor
EIR-07672024Nordex turbine fire prompts investigation at Scottish wind farm130 kmSignificant
EIR-04412025Wind turbine collapses at Aviva's Pitheavlis site in Perth145 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near AB45 3BS is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Aberdeenshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.