← Back to Grampian

Onshore wind · United Kingdom

St Johns Wells Wind Cluster Extension

Operator Green Cat Renewables · Owner Green Cat Holdco Limited

Operational3.2 MWData checked 16 November 2026Source record dated 5 March 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

St Johns Wells Wind Cluster Extension is a 3.2 MW wind farm 15 km north of Inverurie, Grampian, United Kingdom. Its planning application (APP/2009/4121) went to Aberdeenshire on 11 January 2010 and was granted on 22 June 2012. It has been operating since 1 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 28 other energy sites within 10 km, 19 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 34 other sites and 300 energy sites within 40 km for St Johns Wells Wind Cluster Extension

Members see the sites and incidents around this one, and every record behind them.

GREEN CAT RENEWABLES LIMITED (SC277156), active, since 2004. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
3.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Green Cat Renewables
Owner
Green Cat Holdco Limited
Location
St Johns Wells, Fyvie, Turriff AB53 8PX, Grampian, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2009/4121
First operating
2015
Turbines
4

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/2009/4121, with what the planning evidence pack adds for this site.

Every application in Aberdeenshire · Alerts for applications and incidents near here

  • 11 January 2010 Planning application submitted
  • 22 June 2012 Planning permission granted
  • 30 October 2013 Construction started
  • 1 March 2015 Operational

None found. The register holds no published incident that names St Johns Wells Wind Cluster Extension. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has St Johns Wells Wind Cluster Extension had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names St Johns Wells Wind Cluster Extension; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of St Johns Wells Wind Cluster Extension?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 5 March 2015.
Where is St Johns Wells Wind Cluster Extension?
15 km north of Inverurie, Grampian, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).