Onshore wind · United Kingdom

Land to the north west of Hill of Petty

Operator Green Cat Renewables · Owner Green Cat Holdco Limited

Awaiting Construction3.6 MWData checked 16 November 2026Source record dated 25 October 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Land to the north west of Hill of Petty is a 3.6 MW wind farm 14 km south of Turriff, Aberdeenshire, United Kingdom. Its planning application (APP/2015/0112) went to Aberdeenshire on 26 January 2015 and was granted on 18 February 2016. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 31 other energy sites within 10 km, 19 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

GREEN CAT RENEWABLES LIMITED (SC277156), active, since 2004. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Land to the north west of Hill of Petty sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1386, Wind turbine fire near St Cyrus in Aberdeenshire, 71 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-13862022Wind turbine fire near St Cyrus in Aberdeenshire71 kmMinor
EIR-07672024Nordex turbine fire prompts investigation at Scottish wind farm124 kmSignificant
EIR-00632024Fatal fall from turbine nacelle during onshore wind maintenance, UK124 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
3.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Green Cat Renewables
Owner
Green Cat Holdco Limited
Location
Hill of Petty, Fyvie, Turriff, Grampian, Aberdeenshire, AB53 8QR, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2015/0112
Turbines
4, 67 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/2015/0112, with what the planning evidence pack adds for this site.

Every application in Aberdeenshire · Alerts for applications and incidents near here

  • 26 January 2015 Planning application submitted
  • 18 February 2016 Planning permission granted
  • 18 February 2019 Planning permission expired

None found. The register holds no published incident that names Land to the north west of Hill of Petty. If you know of one, report it (confidential reports are anonymised).

Has Land to the north west of Hill of Petty had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land to the north west of Hill of Petty; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Land to the north west of Hill of Petty?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 25 October 2018.
Where is Land to the north west of Hill of Petty?
14 km south of Turriff, Aberdeenshire, United Kingdom (postcode AB53 8QR).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).