Solar · United Kingdom
Mackies Dairy PV
Operator Mackies Of Scotland Ltd
Operational1.8 MWData checked 16 November 2026Source record dated 29 September 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Mackies Dairy PV is a 1.8 MW solar farm 10 km north of Inverurie, Grampian, United Kingdom. Its planning application (APP/2014/0251) went to Aberdeenshire on 11 February 2014 and was granted on 12 May 2014. It has been operating since 28 September 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 33 other energy sites within 10 km, one of them a solar farm. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Mackies Dairy PV changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 1.8 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Mackies Of Scotland Ltd
- Location
- Land to the North East of Mackies of Scotland Dairy, Hill of Easterton, Rothienorman, Inverurie, Grampian, AB51 8US, United Kingdom
- Planning authority
- Aberdeenshire
- Planning application
- APP/2014/0251
- First operating
- 2015
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for APP/2014/0251, with what the planning evidence pack adds for this site.
Every application in Aberdeenshire · Alerts for applications and incidents near here
Timeline
- 11 February 2014 Planning application submitted
- 12 May 2014 Planning permission granted
- 28 July 2015 Construction started
- 28 September 2015 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Mackies Dairy PV. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Mackies Dairy PV had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Mackies Dairy PV; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Mackies Dairy PV?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 29 September 2015.
- Where is Mackies Dairy PV?
- 10 km north of Inverurie, Grampian, United Kingdom (postcode AB51 8US).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).