← Back to Aberdeenshire

Energy sites / United Kingdom / Aberdeenshire

Battery storage · United Kingdom

Fairfield - Battery Energy Storage System

Application Refused49.9 MWChecked 6 October 2026Last changed in the dataset 27 April 2026

Technology
Battery storage (Stand-alone Storage)
Capacity
49.9 MW
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Green Switch Capital
Location
Fairfield, Inverurie, Aberdeenshire, AB51 5BL, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2025/1015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 15 July 2025 Planning application submitted
  • 25 February 2026 Planning permission refused

None found. The register holds no published incident that names Fairfield - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

The register holds 14 incidents at battery storage sites in the United Kingdom, 9 of them fires, and 177 worldwide. Counts of incidents in published reporting, not rates.

What fails at battery storage sites · All battery storage incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.