← Back to Lincolnshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Sand Lane Solar Farm

Operator PS Renewables Limited · Owner Padero Solaer LTD

Awaiting Construction20.2 MWData checked 16 November 2026Source record dated 22 September 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Sand Lane Solar Farm is a 20.2 MW solar farm 9 km south of Scunthorpe, Lincolnshire, United Kingdom. Its planning application (PA/2025/620) went to North Lincolnshire on 4 June 2025 and was granted on 5 August 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 21 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

PS RENEWABLES LIMITED (08279667), active, since 2012. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Sand Lane Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1552, Fire starts in solar panels on commercial roof in Doncaster, 25 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster25 kmSignificant
EIR-07642024Transformer smoking at solar farm in Burton Pedwardine62 kmMinor
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton72 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
20.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
PS Renewables Limited
Owner
Padero Solaer LTD
Location
Sand Lane Solar Farm, West of Manton, Lincolnshire, DN21 3HY, United Kingdom
Planning authority
North Lincolnshire
Planning application
PA/2025/620

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PA/2025/620, with what the planning evidence pack adds for this site.

Every application in North Lincolnshire · Alerts for applications and incidents near here

Status changed from Application Submitted to Awaiting Construction on 16 November 2026.

  • 4 June 2025 Planning application submitted
  • 5 August 2026 Planning permission granted
  • 5 August 2031 Planning permission runs out

None found. The register holds no published incident that names Sand Lane Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Sand Lane Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Sand Lane Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Sand Lane Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Sand Lane Solar Farm?
9 km south of Scunthorpe, Lincolnshire, United Kingdom (postcode DN21 3HY).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).