Solar · United Kingdom
Ferry Lane, Skellingthorpe - Solar Panels
Operator PS Renewables Limited · Owner Padero Solaer LTD
Awaiting Construction20.2 MWData checked 16 November 2026Source record dated 23 June 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Ferry Lane, Skellingthorpe - Solar Panels is a 20.2 MW solar farm 4.8 km west of Lincoln, United Kingdom. Its planning application (25/0521/FUL) went to North Kesteven on 8 May 2025 and was granted on 14 May 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 20 other energy sites within 10 km, 12 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Ferry Lane, Skellingthorpe - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
PS RENEWABLES LIMITED (08279667), active, since 2012. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Ferry Lane, Skellingthorpe - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0764, Transformer smoking at solar farm in Burton Pedwardine, 35 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0764 | 2024 | Transformer smoking at solar farm in Burton Pedwardine | 35 km | Minor |
| EIR-1552 | 2023 | Fire starts in solar panels on commercial roof in Doncaster | 37 km | Significant |
| EIR-1265 | 2024 | Solar panels catch fire and destroy three buildings in Harby | 45 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 20.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- PS Renewables Limited
- Owner
- Padero Solaer LTD
- Location
- North Of Ferry Lane North-East Of Skellingthorpe & West Of Burton Waters, Lincolnshire, LN6 5TX, United Kingdom
- Planning authority
- North Kesteven
- Planning application
- 25/0521/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 25/0521/FUL, with what the planning evidence pack adds for this site.
Every application in North Kesteven · Alerts for applications and incidents near here
Timeline
- 8 May 2025 Planning application submitted
- 14 May 2026 Planning permission granted
- 14 May 2029 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Ferry Lane, Skellingthorpe - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Ferry Lane, Skellingthorpe - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Ferry Lane, Skellingthorpe - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Ferry Lane, Skellingthorpe - Solar Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 23 June 2025.
- Where is Ferry Lane, Skellingthorpe - Solar Panels?
- 4.8 km west of Lincoln, United Kingdom (postcode LN6 5TX).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).