← Back to Essex
Planning pack for this site, £295Other options

Solar · United Kingdom

Skye Green Solar Farm

Operator PS Renewables Limited · Owner Padero Solaer LTD

Awaiting Construction15 MWData checked 16 November 2026Source record dated 16 February 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Skye Green Solar Farm is a 15 MW solar farm on the edge of Kelvedon, Essex, United Kingdom. Its planning application (24/02658/FUL) went to Braintree on 17 December 2024 and was granted on 3 April 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 42 other energy sites within 10 km, 30 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

PS RENEWABLES LIMITED (08279667), active, since 2012. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Skye Green Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2223, Homeowners allege solar panel fault caused Tolleshunt Knights house fire, 9.5 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-22232023Homeowners allege solar panel fault caused Tolleshunt Knights house fire9.5 kmMajor
EIR-25892022Rooftop solar panels reported to have overheated and sparked fire at Colchester church13 kmSignificant
EIR-15372021Garage fire from overheated solar batteries in South Woodham Ferrers26 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
15 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
PS Renewables Limited
Owner
Padero Solaer LTD
Location
Feeringbury Farm, Coggeshall Road, Feering, Colchester, Essex, CO5 9RB, United Kingdom
Planning authority
Braintree
Planning application
24/02658/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/02658/FUL, with what the planning evidence pack adds for this site.

Every application in Braintree · Alerts for applications and incidents near here

  • 17 December 2024 Planning application submitted
  • 3 April 2025 Planning permission granted
  • 3 April 2028 Planning permission runs out

None found. The register holds no published incident that names Skye Green Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Skye Green Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Skye Green Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Skye Green Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 February 2026.
Where is Skye Green Solar Farm?
On the edge of Kelvedon, Essex, United Kingdom (postcode CO5 9RB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).