Highfields Farm (Colchester)

Operator Hive Energy

Operational12.2 MWData checked 16 November 2026Source record dated 2 September 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Highfields Farm (Colchester) is a 12.2 MW solar farm on the edge of Kelvedon, Essex, United Kingdom. Its planning application (121949 (12/1949/FUL)) went to Colchester on 21 December 2012 and was granted on 25 September 2013. It has been operating since 28 March 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 36 other energy sites within 10 km, 27 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 27 other sites and 357 energy sites within 40 km for Highfields Farm (Colchester)

Members see the sites and incidents around this one, and every record behind them.

HIVE ENERGY ASIA LIMITED (11668649), active, since 2018. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
12.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Hive Energy
Location
Highfields Lane, Messing, Colchester, Essex, CO5 9BJ, United Kingdom
Planning authority
Colchester
Planning application
121949 (12/1949/FUL)
First operating
2014

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 121949 (12/1949/FUL), with what the planning evidence pack adds for this site.

Every application in Colchester · Alerts for applications and incidents near here

  • 21 December 2012 Planning application submitted
  • 25 September 2013 Planning permission granted
  • 28 March 2014 Operational

None found. The register holds no published incident that names Highfields Farm (Colchester). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Highfields Farm (Colchester) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Highfields Farm (Colchester); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Highfields Farm (Colchester)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 2 September 2014.
Where is Highfields Farm (Colchester)?
On the edge of Kelvedon, Essex, United Kingdom (postcode CO5 9BJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).