Solar · United Kingdom
Cox's Brook Solar Farm - Solar Array
Operator PS Renewables Limited · Owner Padero Solaer LTD
Awaiting Construction16 MWData checked 16 November 2026Source record dated 16 February 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Cox's Brook Solar Farm - Solar Array is a 16 MW solar farm 3.4 km north of Gloucester, United Kingdom. Its planning application (23/00441/FUL) went to Tewkesbury on 3 May 2023 and was granted on 24 April 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 61 other energy sites within 10 km, 48 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Cox's Brook Solar Farm - Solar Array changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
PS RENEWABLES LIMITED (08279667), active, since 2012. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Cox's Brook Solar Farm - Solar Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2109, Solar installer falls through fragile farm roof at Kemble, suffering brain injuries, 29 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2109 | 2015 | Solar installer falls through fragile farm roof at Kemble, suffering brain injuries | 29 km | Major |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 29 km | Significant |
| EIR-2523 | 2020 | Suspected solar panel fault sparks roof fire at Ombersley home | 43 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 16 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- PS Renewables Limited
- Owner
- Padero Solaer LTD
- Location
- W/O Twigworth And E/O Coxs Brook, Twigworth, Gloucester, Gloucestershire, GL2 9PG, United Kingdom
- Planning authority
- Tewkesbury
- Planning application
- 23/00441/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 23/00441/FUL, with what the planning evidence pack adds for this site.
Every application in Tewkesbury · Alerts for applications and incidents near here
Timeline
- 3 May 2023 Planning application submitted
- 24 April 2024 Planning permission granted
- 24 April 2027 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Cox's Brook Solar Farm - Solar Array. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Cox's Brook Solar Farm - Solar Array had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Cox's Brook Solar Farm - Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Cox's Brook Solar Farm - Solar Array?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 February 2026.
- Where is Cox's Brook Solar Farm - Solar Array?
- 3.4 km north of Gloucester, United Kingdom (postcode GL2 9PG).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).