Solar · United Kingdom

Rhas Fach Farm

Operator Power for Wales Inc

Planning Permission Expired1.2 MWData checked 16 November 2026Source record dated 27 August 2019

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Rhas Fach Farm is a 1.2 MW solar farm 8.2 km north of Burry Port, Carmarthenshire, United Kingdom. Its planning application (W/32377) went to Carmarthenshire on 22 July 2015 and was granted on 30 September 2015. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 24 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 1 other site and 182 energy sites within 40 km for Rhas Fach Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
1.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Expired
Operator or applicant
Power for Wales Inc
Location
Rhas Fach Farm, Heol Mansant, Pontyates, Llanelli, Dyfed, Carmarthenshire, SA15 5SB, United Kingdom
Planning authority
Carmarthenshire
Planning application
W/32377

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for W/32377, with what the planning evidence pack adds for this site.

Every application in Carmarthenshire · Alerts for applications and incidents near here

  • 22 July 2015 Planning application submitted
  • 30 September 2015 Planning permission granted
  • 30 September 2020 Planning permission expired

None found. The register holds no published incident that names Rhas Fach Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Rhas Fach Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Rhas Fach Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Rhas Fach Farm?
Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 27 August 2019.
Where is Rhas Fach Farm?
8.2 km north of Burry Port, Carmarthenshire, United Kingdom (postcode SA15 5SB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).