Solar · United Kingdom

Morfa Pingett Solar Farm

Operator Richard Thomas and Co (Hydro) Limited

Application Refused1.6 MWData checked 16 November 2026Source record dated 10 December 2021

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Morfa Pingett Solar Farm is a 1.6 MW solar farm 4.8 km north-west of Burry Port, Dyfed, United Kingdom. Its planning application (PL/02407) went to Carmarthenshire on 19 August 2021 and was refused on 4 October 2021. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 12 other energy sites within 10 km, 8 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

171 energy sites within 40 km for Morfa Pingett Solar Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
1.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Richard Thomas and Co (Hydro) Limited
Location
Morfa Pingett Solar Farm, Pembrey, Burry Port, Dyfed, SA16 0JE, United Kingdom
Planning authority
Carmarthenshire
Planning application
PL/02407

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PL/02407, with what the planning evidence pack adds for this site.

Every application in Carmarthenshire · Alerts for applications and incidents near here

  • 19 August 2021 Planning application submitted
  • 4 October 2021 Planning permission refused

None found. The register holds no published incident that names Morfa Pingett Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Morfa Pingett Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Morfa Pingett Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Morfa Pingett Solar Farm?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 10 December 2021.
Where is Morfa Pingett Solar Farm?
4.8 km north-west of Burry Port, Dyfed, United Kingdom (postcode SA16 0JE).