Planning pack for this site, £295Other options

Solar · United Kingdom

Morfa Pingett

Operator Richard Thomas Associates

Revised1.6 MWData checked 16 November 2026Source record dated 30 June 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Morfa Pingett is a 1.6 MW solar farm 5.4 km north-west of Burry Port, Carmarthenshire, United Kingdom. Its planning application (S/40618) went to Carmarthenshire on 21 May 2020 and was refused on 11 March 2021. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 11 other energy sites within 10 km, 8 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Morfa Pingett sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1453, Fire crews tackle solar panel unit blaze in Burnham-On-Sea, 106 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14532026Fire crews tackle solar panel unit blaze in Burnham-On-Sea106 kmMinor
EIR-15332022Solar panel fault causes fire at village hall roof in Cheriton Bishop116 kmSignificant
EIR-14862026Fire under solar panels at Broadclyst brought under control122 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
Richard Thomas Associates
Location
MORFA PINGETT, Pinged, Burry Port, Carmarthenshire, SA16 0JE, United Kingdom
Planning authority
Carmarthenshire
Planning application
S/40618

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S/40618, with what the planning evidence pack adds for this site.

Every application in Carmarthenshire · Alerts for applications and incidents near here

  • 21 May 2020 Planning application submitted
  • 11 March 2021 Planning permission refused

None found. The register holds no published incident that names Morfa Pingett. If you know of one, report it (confidential reports are anonymised).

Has Morfa Pingett had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Morfa Pingett; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Morfa Pingett?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 30 June 2020.
Where is Morfa Pingett?
5.4 km north-west of Burry Port, Carmarthenshire, United Kingdom (postcode SA16 0JE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).