Solar · United Kingdom

Pentre farm

Operator Kinetica Solar

Operational5.5 MWData checked 16 November 2026Source record dated 19 January 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Pentre farm is a 5.5 MW solar farm 7.6 km north-west of Pontarddulais, Carmarthenshire, United Kingdom. Its planning application (S/27526) went to Carmarthenshire on 18 December 2012 and was granted on 11 March 2013. It has been operating since 25 September 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 35 other energy sites within 10 km, 23 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 2 other sites and 198 energy sites within 40 km for Pentre farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Kinetica Solar
Location
Pentre Farm, Llannon, Llanelli, Carmarthenshire, SA14 6AP, United Kingdom
Planning authority
Carmarthenshire
Planning application
S/27526
First operating
2014

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S/27526, with what the planning evidence pack adds for this site.

Every application in Carmarthenshire · Alerts for applications and incidents near here

  • 18 December 2012 Planning application submitted
  • 11 March 2013 Planning permission granted
  • 25 September 2014 Operational

None found. The register holds no published incident that names Pentre farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Pentre farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Pentre farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Pentre farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 19 January 2015.
Where is Pentre farm?
7.6 km north-west of Pontarddulais, Carmarthenshire, United Kingdom (postcode SA14 6AP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).