Planning pack for this site, £295Other options

Solar · United Kingdom

Brynrhyd Solar Farm

Operator Capital Dynamics Limited

Awaiting Construction36 MWData checked 16 November 2026Source record dated 5 August 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Brynrhyd Solar Farm is a 36 MW solar farm 4.4 km north of Pontarddulais, Carmarthenshire, United Kingdom. Its planning application (DNS/3260565) went to Welsh Government (NSIP) on 28 October 2021 and was granted on 20 June 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 45 other energy sites within 10 km, 25 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Brynrhyd Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1453, Fire crews tackle solar panel unit blaze in Burnham-On-Sea, 94 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14532026Fire crews tackle solar panel unit blaze in Burnham-On-Sea94 kmMinor
EIR-14162025Fire at Bristol hospital started in solar panels107 kmSignificant
EIR-12742022Fire damages rooftop solar panels at We The Curious in Bristol107 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
36 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Capital Dynamics Limited
Location
Near Llanedi, Pontarddulais, Swansea, Carmarthenshire, SA4 0FD, United Kingdom
Planning authority
Welsh Government (NSIP)
Planning application
DNS/3260565

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DNS/3260565, with what the planning evidence pack adds for this site.

Every application in Welsh Government (NSIP) · Alerts for applications and incidents near here

  • 28 October 2021 Planning application submitted
  • 20 June 2023 Planning permission granted
  • 30 November 2027 Planning permission runs out

None found. The register holds no published incident that names Brynrhyd Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Brynrhyd Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Brynrhyd Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Brynrhyd Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 5 August 2025.
Where is Brynrhyd Solar Farm?
4.4 km north of Pontarddulais, Carmarthenshire, United Kingdom (postcode SA4 0FD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).