Planning pack for this site, £295Other options

Solar · United Kingdom

Tesco Superstore, Tidal Reach - Solar PV Array

Operator Tesco Plc

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 2 January 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Tesco Superstore, Tidal Reach - Solar PV Array is a 0.3 MW solar farm in Pontarddulais, West Glamorgan, United Kingdom. Its planning application (2025/2575/PLD) went to Swansea on 5 December 2025 and was granted on 6 January 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 62 other energy sites within 10 km, 32 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

TESCO PLC (00445790), active, since 1947. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Tesco Superstore, Tidal Reach - Solar PV Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1453, Fire crews tackle solar panel unit blaze in Burnham-On-Sea, 91 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14532026Fire crews tackle solar panel unit blaze in Burnham-On-Sea91 kmMinor
EIR-14162025Fire at Bristol hospital started in solar panels105 kmSignificant
EIR-12742022Fire damages rooftop solar panels at We The Curious in Bristol105 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Tesco Plc
Location
Tesco Superstore, Tidal Reach, Pontarddulais, Swansea, West Glamorgan, SA4 8TA, United Kingdom
Planning authority
Swansea
Planning application
2025/2575/PLD

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2025/2575/PLD, with what the planning evidence pack adds for this site.

Every application in Swansea · Alerts for applications and incidents near here

  • 6 January 2015 Planning permission expired
  • 5 December 2025 Planning application submitted
  • 6 January 2026 Planning permission granted

None found. The register holds no published incident that names Tesco Superstore, Tidal Reach - Solar PV Array. If you know of one, report it (confidential reports are anonymised).

Has Tesco Superstore, Tidal Reach - Solar PV Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Tesco Superstore, Tidal Reach - Solar PV Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Tesco Superstore, Tidal Reach - Solar PV Array?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 2 January 2026.
Where is Tesco Superstore, Tidal Reach - Solar PV Array?
In Pontarddulais, West Glamorgan, United Kingdom (postcode SA4 8TA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).