Solar · United Kingdom

Pen Y Cae solar farm

Operator Rockfire Capital

Operational6.9 MWData checked 16 November 2026Source record dated 2 May 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Pen Y Cae solar farm is a 6.9 MW solar farm on the edge of Ammanford, Dyfed, United Kingdom. Its planning application (E/28086) went to Carmarthenshire on 18 April 2013 and was granted on 19 September 2013. It has been operating since 26 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 21 other energy sites within 10 km, 14 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 2 other sites and 213 energy sites within 40 km for Pen Y Cae solar farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
6.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Rockfire Capital
Location
Pen Y Cae, Saron, Ammanford, Dyfed, Dyfed, SA18 3BJ, United Kingdom
Planning authority
Carmarthenshire
Planning application
E/28086
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for E/28086, with what the planning evidence pack adds for this site.

Every application in Carmarthenshire · Alerts for applications and incidents near here

  • 18 April 2013 Planning application submitted
  • 19 September 2013 Planning permission granted
  • 3 November 2014 Construction started
  • 26 March 2015 Operational

None found. The register holds no published incident that names Pen Y Cae solar farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Pen Y Cae solar farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Pen Y Cae solar farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Pen Y Cae solar farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 2 May 2017.
Where is Pen Y Cae solar farm?
On the edge of Ammanford, Dyfed, United Kingdom (postcode SA18 3BJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).