← Back to Dyfed

Solar · United Kingdom

Clawdd Ddu PV

Operator Elgin Energy EsCo

Operational13.5 MWData checked 16 November 2026Source record dated 26 August 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Clawdd Ddu PV is a 13.5 MW solar farm 4.2 km south-west of Ammanford, Dyfed, United Kingdom. Its planning application (S/27987) went to Carmarthenshire on 27 March 2013 and was granted on 7 October 2013. It has been operating since 26 March 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 30 other energy sites within 10 km, 20 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 24 other sites and 215 energy sites within 40 km for Clawdd Ddu PV

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
13.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Elgin Energy EsCo
Location
Potardulas Road, Tycroes, Swansea, Dyfed, SA18 3RE, United Kingdom
Planning authority
Carmarthenshire
Planning application
S/27987
First operating
2014

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S/27987, with what the planning evidence pack adds for this site.

Every application in Carmarthenshire · Alerts for applications and incidents near here

  • 27 March 2013 Planning application submitted
  • 7 October 2013 Planning permission granted
  • 26 March 2014 Operational

None found. The register holds no published incident that names Clawdd Ddu PV. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Clawdd Ddu PV had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Clawdd Ddu PV; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Clawdd Ddu PV?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 26 August 2014.
Where is Clawdd Ddu PV?
4.2 km south-west of Ammanford, Dyfed, United Kingdom (postcode SA18 3RE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).