Solar · United Kingdom
Burnt Ash Farm
Operator Kinetica Solar
Appeal Refused13.5 MWData checked 16 November 2026Source record dated 26 October 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Burnt Ash Farm is a 13.5 MW solar farm 6.5 km south-east of Manningtree, Essex, United Kingdom. Its planning application (13/01340/FUL) went to Tendring on 17 December 2013 and was refused on appeal on 8 September 2015. Its status in the Renewable Energy Planning Database (UK government) is appeal refused. There are 20 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Burnt Ash Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 13.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Appeal Refused
- Operator or applicant
- Kinetica Solar
- Location
- Burnt Ash Farm Spinnels Lane Wix Manningtree Essex, Essex, CO11 2UJ, United Kingdom
- Planning authority
- Tendring
- Planning application
- 13/01340/FUL
- Appeal reference
- 14/00055/REFUSE
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 13/01340/FUL, with what the planning evidence pack adds for this site.
Every application in Tendring · Alerts for applications and incidents near here
Timeline
- 17 December 2013 Planning application submitted
- 1 August 2014 Planning permission refused
- 29 September 2014 Appeal lodged
- 8 September 2015 Appeal refused
Incidents on the register at this site
None found. The register holds no published incident that names Burnt Ash Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Burnt Ash Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Burnt Ash Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Burnt Ash Farm?
- Appeal Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 26 October 2015.
- Where is Burnt Ash Farm?
- 6.5 km south-east of Manningtree, Essex, United Kingdom (postcode CO11 2UJ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).