← Back to Essex
Planning pack for this site, £295Other options

Solar · United Kingdom

Primrose Hall Solar Farm

Operator Low Carbon Limited · Owner Low Carbon Holdco Limited

Awaiting Construction20 MWData checked 16 November 2026Source record dated 21 March 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Primrose Hall Solar Farm is a 20 MW solar farm 7.7 km south-east of Manningtree, Essex, United Kingdom. Its planning application (20/01384/FUL) went to Tendring on 2 October 2020 and was granted on 19 March 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 20 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

LOW CARBON LIMITED (13356797), active, since 2021. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Primrose Hall Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2815, Solar panel on school roof starts primary school fire in Ipswich, 16 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-28152026Solar panel on school roof starts primary school fire in Ipswich16 kmSignificant
EIR-27312021Electrical fault in solar panel control unit sparks loft fire in Ipswich16 kmMinor
EIR-25892022Rooftop solar panels reported to have overheated and sparked fire at Colchester church19 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
20 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Low Carbon Limited
Owner
Low Carbon Holdco Limited
Location
S/O Primrose Hall, Essex, CO12 5NB, United Kingdom
Planning authority
Tendring
Planning application
20/01384/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 20/01384/FUL, with what the planning evidence pack adds for this site.

Every application in Tendring · Alerts for applications and incidents near here

  • 2 October 2020 Planning application submitted
  • 19 March 2021 Planning permission granted
  • 19 March 2024 Planning permission expired

None found. The register holds no published incident that names Primrose Hall Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Primrose Hall Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Primrose Hall Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Primrose Hall Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 21 March 2023.
Where is Primrose Hall Solar Farm?
7.7 km south-east of Manningtree, Essex, United Kingdom (postcode CO12 5NB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).