Solar · United Kingdom

Pont Andrew Solar Farm

Operator Lightsource Renewable Energy · Owner Lightsource Holdings 3 Limited

Operational1.5 MWData checked 16 November 2026Source record dated 26 March 2013

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Pont Andrew Solar Farm is a 1.5 MW solar farm 9.6 km north-west of Pontarddulais, Dyfed, United Kingdom. Its planning application (S/24069) went to Carmarthenshire on 29 November 2010 and was granted on 22 April 2011. It has been operating since 31 July 2012. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 22 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 178 other sites and 192 energy sites within 40 km for Pont Andrew Solar Farm

Members see the sites and incidents around this one, and every record behind them.

LIGHTSOURCE RENEWABLE ENERGY LIMITED (08946381), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
1.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Lightsource Renewable Energy
Owner
Lightsource Holdings 3 Limited
Location
LAND AT FORMER CYNHEIDRE SHAFTS 3 & 4, CYNHEIDRE, LLANELLI, Dyfed, United Kingdom
Planning authority
Carmarthenshire
Planning application
S/24069
First operating
2012

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S/24069, with what the planning evidence pack adds for this site.

Every application in Carmarthenshire · Alerts for applications and incidents near here

  • 29 November 2010 Planning application submitted
  • 22 April 2011 Planning permission granted
  • 31 July 2012 Operational

None found. The register holds no published incident that names Pont Andrew Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Pont Andrew Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Pont Andrew Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Pont Andrew Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 26 March 2013.
Where is Pont Andrew Solar Farm?
9.6 km north-west of Pontarddulais, Dyfed, United Kingdom.