← Back to Cumbria
Planning pack for this site, £295Other options

Solar · United Kingdom

North Lane, Haverigg - Solar Photovoltaic System

Operator Her Majestys Prison & Probation Service

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 4 March 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

North Lane, Haverigg - Solar Photovoltaic System is a 0.2 MW solar farm on the edge of Millom, Cumbria, United Kingdom. Its planning application (4/21/2523/0E1) went to Cumberland on 29 November 2021 and was granted on 26 January 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 16 other energy sites within 10 km, 8 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for North Lane, Haverigg - Solar Photovoltaic System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 94 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school94 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof114 kmMinor
EIR-14002023Solar panel and battery fire at a bungalow on Anglesey115 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Her Majestys Prison & Probation Service
Location
H M Prison, North Lane, Haverigg,. Millom, Cumbria, LA18 4NA, United Kingdom
Planning authority
Cumberland
Planning application
4/21/2523/0E1

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 4/21/2523/0E1, with what the planning evidence pack adds for this site.

Every application in Cumberland · Alerts for applications and incidents near here

  • 29 November 2021 Planning application submitted
  • 26 January 2022 Planning permission granted

None found. The register holds no published incident that names North Lane, Haverigg - Solar Photovoltaic System. If you know of one, report it (confidential reports are anonymised).

Has North Lane, Haverigg - Solar Photovoltaic System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names North Lane, Haverigg - Solar Photovoltaic System; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of North Lane, Haverigg - Solar Photovoltaic System?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 4 March 2022.
Where is North Lane, Haverigg - Solar Photovoltaic System?
On the edge of Millom, Cumbria, United Kingdom (postcode LA18 4NA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).