← Back to Cumbria
Planning pack for this site, £295Other options

Solar · United Kingdom

JJC Waste Management, Sandscale Park - Solar Panels

Operator JJC Waste Management

Awaiting Construction0.7 MWData checked 16 November 2026Source record dated 4 August 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

JJC Waste Management, Sandscale Park - Solar Panels is a 0.7 MW solar farm 3.5 km west of Dalton in Furness, Cumbria, United Kingdom. Its planning application (B18/2023/0393) went to Westmorland and Furness on 9 June 2023 and was granted on 27 July 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 27 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for JJC Waste Management, Sandscale Park - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 87 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school87 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof107 kmMinor
EIR-14002023Solar panel and battery fire at a bungalow on Anglesey114 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
JJC Waste Management
Location
Jjc Waste Management, Sandscale Park, Barrow in Furness, Cumbria, LA14 4QT, United Kingdom
Planning authority
Westmorland and Furness
Planning application
B18/2023/0393

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for B18/2023/0393, with what the planning evidence pack adds for this site.

Every application in Westmorland and Furness · Alerts for applications and incidents near here

  • 9 June 2023 Planning application submitted
  • 27 July 2023 Planning permission granted
  • 27 July 2026 Planning permission expired

None found. The register holds no published incident that names JJC Waste Management, Sandscale Park - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has JJC Waste Management, Sandscale Park - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names JJC Waste Management, Sandscale Park - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of JJC Waste Management, Sandscale Park - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 4 August 2023.
Where is JJC Waste Management, Sandscale Park - Solar Panels?
3.5 km west of Dalton in Furness, Cumbria, United Kingdom (postcode LA14 4QT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).