Onshore wind · United Kingdom

Haverigg Extension Wind Farm

Operator The Wind Company

Operational2.4 MWData checked 16 November 2026Source record dated 11 April 2011

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Haverigg Extension Wind Farm is a 2.4 MW wind farm 3.5 km west of Millom, Cumbria, United Kingdom. Its planning application (4/91/0463/0) went to Cumberland on 29 May 1991 and was granted on 8 August 1991. It has been operating since 1 July 1998. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 16 other energy sites within 10 km, 7 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 1 other site and 86 energy sites within 40 km for Haverigg Extension Wind Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
2.4 MW (this record)
All phases
3.6 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
The Wind Company
Location
Kirksanton AirfieldPart of Hemplands FarmHaveriggMillomCumbria, Cumbria, United Kingdom
Planning authority
Cumberland
Planning application
4/91/0463/0
First operating
1998
Turbines
4

This record is 2.4 MW, one part of a site built in phases. With Haverigg Repowering (Haverigg II) (1.2 MW) the phases on the register add up to 3.6 MW. Haverigg Repowering (Haverigg II)

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 4/91/0463/0, with what the planning evidence pack adds for this site.

Every application in Cumberland · Alerts for applications and incidents near here

  • 29 May 1991 Planning application submitted
  • 8 August 1991 Planning permission granted
  • 1 July 1998 Operational

None found. The register holds no published incident that names Haverigg Extension Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Haverigg Extension Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Haverigg Extension Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Haverigg Extension Wind Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 11 April 2011.
Where is Haverigg Extension Wind Farm?
3.5 km west of Millom, Cumbria, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).