Haverigg Repowering (Haverigg II)
Operator Windprospect
Operational1.2 MWData checked 16 November 2026Source record dated 11 April 2011
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Haverigg Repowering (Haverigg II) is a 1.2 MW wind farm 3.5 km west of Millom, Cumbria, United Kingdom. Its planning application (4/02/0505/0) went to Cumberland on 29 April 2002 and was granted on 15 August 2002. It has been operating since 1 May 2004. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 16 other energy sites within 10 km, 7 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Haverigg Repowering (Haverigg II) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 1.2 MW (this record)
- All phases
- 3.6 MW, the phases on the register added up
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Windprospect
- Location
- Kirksanton Airfield Part of Hemplands Farm Haverigg Millom Cumbria, Cumbria, United Kingdom
- Planning authority
- Cumberland
- Planning application
- 4/02/0505/0
- First operating
- 2004
- Turbines
- 5
This record is 1.2 MW, one part of a site built in phases. With Haverigg Extension Wind Farm (2.4 MW) the phases on the register add up to 3.6 MW. Haverigg Extension Wind Farm
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 4/02/0505/0, with what the planning evidence pack adds for this site.
Every application in Cumberland · Alerts for applications and incidents near here
Timeline
- 29 April 2002 Planning application submitted
- 15 August 2002 Planning permission granted
- 1 May 2004 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Haverigg Repowering (Haverigg II). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Haverigg Repowering (Haverigg II) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Haverigg Repowering (Haverigg II); it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Haverigg Repowering (Haverigg II)?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 11 April 2011.
- Where is Haverigg Repowering (Haverigg II)?
- 3.5 km west of Millom, Cumbria, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).