Drigg Wind Cluster is a 3 MW wind farm 12 km south of Egremont, Cumbria, United Kingdom. Its planning application (4/96/0560) went to Cumberland on 29 July 1996 and was refused on appeal on 30 December 1997. Its status in the Renewable Energy Planning Database (UK government) is appeal refused. There are 4 other energy sites within 10 km, 2 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Drigg Wind Cluster changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Appeal Refused
- Operator or applicant
- Windprospect
- Location
- Land adjacent to Shore RoadDriggSeascaleCumbria, Cumbria, United Kingdom
- Planning authority
- Cumberland
- Planning application
- 4/96/0560
- Turbines
- 5
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 4/96/0560, with what the planning evidence pack adds for this site.
Every application in Cumberland · Alerts for applications and incidents near here
Timeline
- 29 July 1996 Planning application submitted
- 7 November 1996 Planning permission refused
- 30 December 1997 Appeal refused
Incidents on the register at this site
None found. The register holds no published incident that names Drigg Wind Cluster. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Drigg Wind Cluster had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Drigg Wind Cluster; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Drigg Wind Cluster?
- Appeal Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 23 June 2009.
- Where is Drigg Wind Cluster?
- 12 km south of Egremont, Cumbria, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).