Solar · United Kingdom

Cleator Solar Park

Operator Cleator Solar Park

Appeal Refused5 MWData checked 16 November 2026Source record dated 1 July 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Cleator Solar Park is a 5 MW solar farm on the edge of Cleator Moor, Cumbria, United Kingdom. Its planning application (4/14/2336/0F1) went to Cumberland on 1 August 2014 and was refused on appeal on 15 June 2016. Its status in the Renewable Energy Planning Database (UK government) is appeal refused. There are 16 other energy sites within 10 km, 4 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

83 energy sites within 40 km for Cleator Solar Park

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Appeal Refused
Operator or applicant
Cleator Solar Park
Location
Land between Woodend and Moor Row, Egremont, Cumbria, CA22 2TA, United Kingdom
Planning authority
Cumberland
Planning application
4/14/2336/0F1
Appeal reference
APP/Z0923/W/15/3138554

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 4/14/2336/0F1, with what the planning evidence pack adds for this site.

Every application in Cumberland · Alerts for applications and incidents near here

  • 1 August 2014 Planning application submitted
  • 1 October 2015 Planning permission refused
  • 14 December 2015 Appeal lodged
  • 15 June 2016 Appeal refused

None found. The register holds no published incident that names Cleator Solar Park. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Cleator Solar Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Cleator Solar Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Cleator Solar Park?
Appeal Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 1 July 2016.
Where is Cleator Solar Park?
On the edge of Cleator Moor, Cumbria, United Kingdom (postcode CA22 2TA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).